Client: E.S. Boulos

Assisting ES Boulos reinstall 10,000lb. blast panels that surrond a 345,000 volt transformer in a substation. Crane placement, ice removal, rigging, and team work all made this a very safe and rewarding project.

The Challenges

Blast panel installation at a 345,000 volt substation.